Groundworks and Foundations
We strip topsoil, set out the footprint with survey pegs and string lines, and dig trenches and pads to the depth written on the structural drawings. Rebar is tied to spec, shutters are squared, and concrete is placed and finished to a datum that has been confirmed twice. We dig, trim, and prepare the sub-base so that strip footings, trench fill, raft slabs, and pad bases all sit on firm, compacted ground that will not creep under load.